Hello,

We noticed you're browsing in private or incognito mode.

To continue reading this article, please exit incognito mode or log in.

Not a subscriber? Subscribe now for unlimited access to online articles.

Intelligent Machines

Construction of the Ares I-X Rocket

The U.S. space agency readies the first test flight of the vehicle destined for the moon.

  • by Brittany Sauser
  • June 23, 2009
  • Jon Cowart, deputy manager for the Ares I-X, stands in the vehicle assembly building at Kennedy Space Center.
Steel pieces that make up most of Ares I-X are clustered in High Bay 4 of the assembly building. The five cylinders represent the interstage and upper stage of Ares I; the final piece is the dart-shaped mock-up of the crew capsule.
Since this first test flight of Ares I will not reach orbit, the fifth segment of the vehicle’s rocket booster isn’t needed. Engineers created a dummy version of the segment, which will hold the avionics module that guides the rocket’s flight.
A system designed to control rotational forces on the rocket lies under a blanket that is visible through a hatch in the interstage.
This story is part of our July/August 2009 Issue
See the rest of the issue
Subscribe
Ares I-X has more than 700 sensors that will measure temperature and multiple forces on the rocket during all phases of its flight; some of the most critical sensors, such as those that gauge air pressure and speed, are at the top of the dart-shaped fifth stack, near the simulated rocket nozzles of the launch abort system.
Wires run down the walls of the simulated crew module; when the rocket is finished, they will connect sensors in the module to data recorders that reside in the avionics module (not shown).
A yellow framework known as the “birdcage” surrounds and supports the fifth stack as massive cranes lift it and mate it with its counterpart cylinder. It will take weeks for engineers to stack the rocket’s pieces together. When fully assembled, Ares I-X will stand 99 meters tall and vary from 3.7 to 5.5 meters in diameter; it will weigh more than 800,000 kilograms when fueled.

Keep up with the latest in intelligent machines at EmTech Digital.

The Countdown has begun.
March 25-26, 2019
San Francisco, CA

Register now
More from Intelligent Machines

Artificial intelligence and robots are transforming how we work and live.

Want more award-winning journalism? Subscribe to All Access Digital.
  • All Access Digital {! insider.prices.digital !}*

    {! insider.display.menuOptionsLabel !}

    The digital magazine, plus unlimited site access, our online archive, and The Download delivered to your email in-box each weekday.

    See details+

    12-month subscription

    Unlimited access to all our daily online news and feature stories

    Digital magazine (6 bi-monthly issues)

    Access to entire PDF magazine archive dating back to 1899

    The Download: newsletter delivery each weekday to your inbox

/3
You've read of three free articles this month. for unlimited online access. You've read of three free articles this month. for unlimited online access. This is your last free article this month. for unlimited online access. You've read all your free articles this month. for unlimited online access. You've read of three free articles this month. for more, or for unlimited online access. for two more free articles, or for unlimited online access.