Skip to Content
Uncategorized

Want to 3-D-print your next office? Here’s the formula.

February 15, 2018

As unsexy as it sounds, a new set of equations may be the secret to 3-D printing for construction.

The problem: Firms like 3D Printhuset have tried printing buildings out of concrete on-site, but it can take a long time and the machines have a habit of breaking down.

All about timing: Specifically, the timing for drying concrete. If the lower layers don’t dry fully before the next are added, they buckle under the weight. You don’t want wonky walls.

The solution:  These equations, developed by Akke Suiker from the Eindhoven University of Technology, tell you how much material is needed and how long it needs to dry between layers. Time to fire up the concrete printer.

Keep Reading

Most Popular

Here’s how a Twitter engineer says it will break in the coming weeks

One insider says the company’s current staffing isn’t able to sustain the platform.

Technology that lets us “speak” to our dead relatives has arrived. Are we ready?

Digital clones of the people we love could forever change how we grieve.

How to befriend a crow

I watched a bunch of crows on TikTok and now I'm trying to connect with some local birds.

Starlink signals can be reverse-engineered to work like GPS—whether SpaceX likes it or not

Elon said no thanks to using his mega-constellation for navigation. Researchers went ahead anyway.

Stay connected

Illustration by Rose Wong

Get the latest updates from
MIT Technology Review

Discover special offers, top stories, upcoming events, and more.

Thank you for submitting your email!

Explore more newsletters

It looks like something went wrong.

We’re having trouble saving your preferences. Try refreshing this page and updating them one more time. If you continue to get this message, reach out to us at customer-service@technologyreview.com with a list of newsletters you’d like to receive.